Stand Optimisation Plan
CLIENT:
Available on request
Cuesko undertook a Feasibility Cost Estimate for Auckland International Airport in collaboration with Mott MacDonald.
The overall purpose of the project is to re-configure the stands to optimise their usage and provide improvements in safety and operations.
The project proposed scope of works includes reconfiguration of line-markings, new ground lighting to centre-lines and lead-in lines, re-alignment of the airside road, relocation of Nose-In-Guidance System (NIGS), bollards and Ground Power Units (GPU’s), testing of existing lighting and new compliant lighting, demolition of the existing Static-Link Walkway and rotunda to Stand 4 plus the removal of the Passenger Bridge Walkway; and a new ‘single’ bus-stop enclosure and associated realignment of airside road to Stand 5.